Manufacturing efficiency

 

The client was experiencing difficulties in meeting orders and labour was in short supply locally.  In addition, there were frequent stock-outs and excessive amounts of overtime were being worked.  Weekend working was also the norm, leading to adverse cost variances.  We were asked to recommend a way forwards. 

 

Having examined the method of production, our solution was based upon:





  • Revising the factory layout to ensure that production flowed smoothly
  • Reorganising the raw materials stores allowing stocks to be reduced and parts located
  • Devising a system of "kitting-up" so that each job could be prepared in advance and processed accurately
  • Producing a series of key performance indicators and reports to monitor and control labour productivity

 

The project was quoted on a fixed-fee basis and was completed on time.  As a result, factory efficiency improved from 52 to around 85 performance.  An increase of 60%.  Within three weeks, the backlog of orders was eliminated and stock-outs became a thing of the past.  We also saved the company £14k per annum on their energy bill.





Manufacturing operations

 

The client is a long-established manufacturer from a traditional UK industry.  During the past few years sales turnover had been static and profits declining, mainly due to an influx of cheaper products from the Far East.  Although several new machines had been installed, the operations and processes from within the remainder of the production facility had not been examined for many years. 

 

Our brief, therefore, was to review all aspects of manufacturing and to recommend how the client could raise productivity, leading to a more competitive position in the market.   Recommendations included:







  • Changing shift patterns
  • Re-deploying surplus manpower
  • Improvements in working methods
  • Devising a series of KPI's

 

The report was delivered on schedule and within budget.  Implementation occurred over a period of several months, without any IR difficulties.  The client is now operating at the same level of output, but with fewer staff and less overtime and shift premiums.  Resultant savings were around £250k per annum.





Factory layout

 

This company was only formed during the mid-1980's and had rapidly grown from humble beginnings to a multi-million pound operation.  The production facility, which comprised of two units totalling 60,000 square feet, was now wholly inadequate and was impacting upon the overall efficiency of the business:

 

  • Materials, WIP and finished goods were scattered everywhere
  • There was no clear flow of work
  • Further expansion was virtually impossible





The company had recently acquired a new 100,000 square foot facility and aimed to consolidate operations onto this site.  Our brief was to provide a factory layout that solved the previous problems and catered for "one-piece-flow" from the raw material stores fully through to the finished goods warehouse.  This meant that products that were planned for production at the start of the day could be despatched the same day.

 

In this instance, the factory layout was introduced to the client, accepted and simply handed-down to supervisory staff for implementation.  The transition went smoothly and we were not asked to change any aspect of the layout.  The client has since asked us to undertake many more projects for them. 